Technical Presentation
Transcript: Shooting Dates (Outdoor): (Potential) Studio Set up 2 Indoor Set-up 1 (Aidan's house) We will carry portable lights and reflectors in case we need them, but most likely the daylight will be sufficient. Lots of focus pulls in the performance which we found interesting. Cuts between narrative/performance similarly to how we want to. Individual shots will be taken with both studio set-ups - LS, MS, MCU, CU (of faces and of instruments) Static shots of all types - WS of the band and individual closer shots. Outdoor Set-up 1/2 Camera movement Indoor Set-up 2 (Aidan's house) GoPro One shot at 0:25 that we might want. Shows singer as an inspirational figure Street wall Spotlights on individuals to minimise light hitting black curtain. Shooting dates (Studio): Studio Set up 1 The walls will have music/ drumming posters and there will be music magazines and boyish clothes scattered around the floor and bed. Again, we will use daylight and the street is nearby the first outdoor location. Sony V1E - we are filming indoors and outdoors. Desk Again infinite black. This will have papers and folders on it, with a noticeboard in front, also covered in papers (letters, notes etc.) Also Empty coffee cups (2/3). Acoustic guitar Electric guitar Drum kit Dolly Markers (for the floor) Microphone Official looking papers/letters Lots of stationery Rejection letters (to be made) Band audition poster (to be made) Music magazines Drumming posters Mobile phone Cup Visual references Camera Portable lights and reflectors if the lighting if the lamp on the desk is not enough. (Archway close to indoor location) The Defiance/Group 5 - Technical Presentation We plan to film takes of the song with: Bedroom Coloured spotlights (keeping consistent colours to previous set up) Lighting style at start, camera movements Saturday 9th November Sunday 17th November Saturday 23rd November This applies to full band shots, individual shots, and narrative. Street/ Lampost Infinite black background using the black curtain. - Tilts up and down - Arcing across - Zooms - Tracking Guitar shots/microphone movement shots. Not a very busy street, so filming will not be a problem. We will only use natural light here. Coloured back lights: (from left to right) - Blue for Daniel - Purple for Shobnam - Red for Aidan Friday 8th November Thursday 14th November Friday 15th November Wednesday 20th November Thursday 21st Novemeber Friday 22nd November Mise-en-scene Props list: